"MODERNISATION OF THE RAILWAY SECTION SOFIA - ELIN PELIN"

Grand agreement №: INEA/CEF/TRAN/M2014/1048809
Contracting authority: European Climate, Infrastructure and Environment Executive Agency (CINEA)
Total project costs: 67 984 600 EUR
Funding sources:
CEF Grant (EU co-financing): 57 786 910 EUR
State budget (National co-financing): 10 197 689 EUR
Project end date according to Grand agreement: 31.12.2024
Main activities:
- Activity 1 - Project Management and Communication
- Activity 2 - Technical design for the Sofia-Elin Pelin railway section
- Activity 3 - Land acquisition
- Activity 4 - Construction works
- Activity 5 - Works supervision
- Activity 6 - Interoperability supervision
- Activity 7 - Archaeological monitoring during construction works
The project general objectives are:
- Aiming at removing the bottlenecks on this section of the railway line;
- Ensuring an optimal level of integration and of interoperability on this railway section in compliance with the EU requirements;
- Improving and maintaining the quality of infrastructure in terms of safety, security and efficiency;
- Supporting modal split by fostering the use of railway transport.
The project scope is:
The modernisation and upgrade of the 22-km-long railway section of the Orient-East Med core network corridor (Baltic Sea - Black Sea - Aegean Sea and Western Balkans - East Mediterranean European Transport Corridors according Regulation (EU) 2024/1679) ) Sofia km 0+780.87 (excl.) - Elin Pelin km 22+849 (excl.). The upgraded section will be in line with EU requirements for Core Network Corridors as set by Regulation (EU) 2024/1679), namely: 22.5 t axle load, possibility of running trains with a length of 740 m, and at least 100 km/h speed.